Shenzhen Subway Line 11(Xiangmihu Overpass Bridge)

Project Place:Shenzhen

Construction Company:China Railway Tunnel Stock Co., Ltd.

Project Name:Shenzhen Subway Line 11(Xiangmihu Overpass Bridge)

Height of  the Structure:6.5m

Key points:The height of the structure varies from transverse direction and machine direction and different loading capacity are required at solid beam area and hollow box girder area. 0.9m*1.2m ledgers are used in solid beam area and 1.2m*1.5m ledgers are used in hollow box girder area.

shenzhen project 3.jpg
shenzhen project 2.jpgshenzhen project 1.jpg